3-stage sludge dewatering system in a diamond mine (completed in 2009)

For the “Njurbinskaya” diamond mine in the Russian Republic of Sakha, we realized a plant for the three-stage dewatering of fine-grained kimberlite ore sludge on behalf of ZAO “AK ALROSA”.
The aim was to mechanically process the residues from ore processing, store them temporarily with little water and integrate them into the existing operation – without building a new landfill and without interrupting production.

Commissioning: 2009

Project details
  • Client: ZAO “AK ALROSA”, diamond mine “Njurbinskaya”, Russia

  • Location: Republic of Sakha (Yakutia), Russia

  • Contract type/services: Basic and detailed engineering, delivery of equipment, installation supervision, commissioning, training of operating personnel, after-sales service

Our solution

We developed a three-stage dewatering line consisting of sludge pre-treatment, mechanical thickening and chamber filter presses.
By using flocculants, the sludge could be concentrated to a solids content of 55 % w/w in a targeted manner.

The system was fully integrated into the existing operation – including automated truck loading via a specially adapted conveyor belt system.

Customer benefits

Cost and space savings: no need for new landfill construction

Operational safety: integration of the system during operation

Stable technology: Reliable drainage even under demanding climatic conditions

Technical data
  • Dewatering capacity: 250 t/h
  • Sludge thickening to 55 % w/w with flocculants
  • Chamber filter presses for dewatering kimberlite ore sludge
  • Automatic conveyor belt system for truck loading (40 t)
Robust solution for harsh climates

The solution, which is fully integrated into the existing infrastructure, also proved itself under the extreme climatic conditions in Yakutia – with reliable performance and permanently stable operating processes.