Modernization of an electrolysis department and fully automated PGM sludge processing (completed in 2014)

References skip render: ucaddon_gradient_text_effect skip render: ucaddon_gradient_text_effect MMC Norilsk Nickel intended to comprehensively modernize its electrolysis department at the copper plant and build a state-of-the-art plant for processing precious metal-containing anode slimes (PGM sludge). The aim was to achieve maximum efficiency and product purity at every stage of the process. The new system was to […]

Copper smelter & lead works

References Copper smelter and lead works As part of a comprehensive project from 2006 to 2011, we – with Glencore International AG as the main investor – built a copper smelter with electrolysis for Kazzinc Ltd. and modernized and expanded the lead plant. The aim was to increase production capacity, improve efficiency and significantly reduce […]

Copper smelter / Vanyukov furnace

References Copper smelter / Vanyukov furnace As part of a major project to modernize the copper smelting plant in Almalyk, Uzbekistan, the construction of a new Vanyukov furnace was initiated in 2014. This furnace, which enables an annual production of 73,800 tons of blister copper, represents a significant advance in efficient copper production. With the […]

Flotation plant for sulphide processing

References Flotation plant for sulphide processing In Central Asia, we acted as general contractor (EPC) for the engineering, procurement, construction and commissioning of a state-of-the-art flotation plant for sulphide processing plant. The aim of the project was to increase the performance of the sulphide processing plant by using the advanced flotation machine. Commissioning: May 2024 […]