Modernization of an electrolysis department and fully automated PGM sludge processing

References Modernization of an electrolysis department and fully automated PGM sludge processing MMC Norilsk Nickel intended to comprehensively modernize its electrolysis department at the copper plant and build a state-of-the-art plant for processing precious metal-containing anode slimes (PGM sludge). The aim was to achieve maximum efficiency and product purity at every stage of the process. […]
Copper smelter & lead works

References Copper smelter and lead works As part of a comprehensive project from 2006 to 2011, we – with Glencore International AG as the main investor – built a copper smelter with electrolysis for Kazzinc Ltd. and modernized and expanded the lead plant. The aim was to increase production capacity, improve efficiency and significantly reduce […]
Copper smelter / Vanyukov furnace

References Copper smelter / Vanyukov furnace As part of a major project to modernize the copper smelting plant in Almalyk, Uzbekistan, the construction of a new Vanyukov furnace was initiated in 2014. This furnace, which enables an annual production of 73,800 tons of blister copper, represents a significant advance in efficient copper production. With the […]
Flotation plant for sulphide processing

References Flotation plant for sulphide processing In Central Asia, we acted as general contractor (EPC) for the engineering, procurement, construction and commissioning of a state-of-the-art flotation plant for sulphide processing plant. The aim of the project was to increase the performance of the sulphide processing plant by using the advanced flotation machine. Commissioning: May 2024 […]