Customer Thermal power plant Sostanj, Slovenia
Commissioning 2015
Services
Basic and detail engineering, cold and hot run testing, training of the staff, after-sales-service, technical inspections, maintenance and support during the 30-day trial run
Scope of supply
- Plant design documentation (PZI)
- As built documentation (PID)
- Pneumatic transport of fly ash and coarse ash (multivessel system) incl. pressure vessels with equipment and reservoir for compressed air, pipelines for air, fly and coarse ash, compressors for fly ash transport, bag filters, coarse ash hoppers, steel and sheet-metal structures
- Gypsum suspension drying and storage incl. vacuum belt filter (VBF) with vacuum pump, pumps for process water, gypsum washing and filtrate, pipelines, belt conveyors – below VBF, storage equipment for gypsum, instrument air system
Technical data
Pneumatic Ashtransport
- Transport of fly ash: maximum capacity 2 x 70 t/h
- Transport length: 288 m, approx. 50 m vertically upwards
- Transportof coarse ash: 11,5 t/h
- Transport length: 130 m, approx.. 50 m vertically upwards
Gypsum drying and storage
- Gypsum drying: Drying capacity, max. 2 x 35 t/h of gypsum suspension
- Humidity of gypsum suspension: 55%
- Humidity of dried gypsum: < 10%
- Gypsum storage: storage capacity of gypsum silo: 3,000 m²
- Capacity of silo filling: 40 t/h
- Capacity of silo discharge, min.: 50 t/h, max.:80 t/h
- Loading of trucks/wagons: 80 t/h
- Gypsum transport to mixer: 50 t/h