Calcination plant, deposit "Tashkura", Uzbekistan

TransportsystemeSpecial Plants

Increase of the annual capacity of a phosphate ore treatment plant

 

Customer Navoi Mining & Metallurgical Combine


Commissioning September 2014


Services

Basic and detail engineering, supervision of installation and commissioning, partly technical upgrade of existing plant for phosphate ore treatment, documentation according GOST


Scope of supply       

  • Calcination furnace
  • Rotary drum dryer
  • 350 m of conveyor belt system
  • Bag filter
  • Stack
  • Bunkers, hoppers
  • Auxiliaries

Technical data

  • Throughput of the calcination furnace: 52 t/h of concentrate
  • Characteristics of rotary drum dryer: 52 t/h of concentrate with a thermal capacity of 13 MW 

    Customer benefits

    Increase of the annual capacity of washed and calcined phosphate ore concentrate from 400,000 to 716,000 t with a minimum content of 26% P2O5


       

       

      Project highlight

      Capacity increase/year
      400000
      tons of washed & calcined ore