Customer JSC MMC Norilsk Nickel, Russia
Commissioning 2009
Services
Basic and detail engineering, project planning according to Russian standards, supply of documentation and equipment, installation supervision, commissioning, training of personnel
Scope of supply
Two plants for backfilling and supply of a high pressure pump for the transport of solids, hydrocyclone plant ContiClass®System
Technical data
- Plant 1: 250,000 m3 concrete mix per year
- Plant 2: 1,000.000 m3 concrete mix per year
- Treatment of 2,050,000 t tailings per year
- Transport of solids over a distance of 3.5 km
Customer benefits
- Reduction of
- disposal site for flotation tailings
- slag deposit
- water consumption, the previously consumed water can be used for other applications without further processing
- power consumption
- Closing of gravel recovery and gravel production
- Considerably higher
- availability of the plant
- quality of the concrete mixtures
- reproducibility of concrete recipes
- Significant reduction of space requirement
- Significant noise reduction