Primary comminution stage of gold containing ore, Kokshetau, Kazakhstan

Gold

The first primary comminution stage at a quarry, material transport via trucks, unloading at collecting conveyor belt for further transport by main conveyor belt to the secondary and tertiary comminution stages

Customer  Kazzinc, TOO Altyntau Kokshetau, Kazakhstan


Commissioning March 2013


Services

Basic and Detail Engineering, supply of equiqment, installation supervision and commissioning,training of operator staff, after-sales service


Scope of supply

  • Jaw crusher
  • Vibrating feeder
  • Vibrating trough conveyor
  • Belt conveyors
  • Dedusting
  • Hydraulic breaker
  • Metal detector
  • Metal separators

Technical data

Jaw crusher

  • Construction: B3
  • Capacity: 600 t/h
  • Feed ore size: 140 - 960 mm
  • Product ore size: up to 250 mm
  • Lubrication of support bearings: automatic
  • Feed opening dimensions: 1,500 х 1,070 mm
  • Weight: 53,000 kg
  • Drive motor power: 200 kW

Features

Optimised for transverse impact stress, which ensures trouble-free crusher operation

 


 

Project highlight