Ash transport system, lignite-fired power plant "Kosovo A", Republic of Kosovo

CoalBoiler Slag HandlingFly Ash Handling

Ash transport system for lignite-fired power plant Kosovo A, turnkey

Customer Lignite-fired powerplant "TE Kosovo A", Republic of Kosovo


Commissioning September 2013 


Services

Basic and detail engineering, supply of equipment, installation supervision, commissioning, construction works on-site, training of personnel, after sales service, technical inspections


Scope of supply

Pneumatic transport system for fly ash with 3 x 4 pipings  Ø125 mm, L=150 m / ΔH=30 m

  • Bottom ash conveyor transport system
  • Hydraulic fly ash and bottom ash transport system
  • Silos for fly ash storage, capacity 2 x 1.000 m³
  • Silo for bottom ash storage, capacity 1 x 200 m3 with 2 discharges
  • Auxiliary systems such as compressor stations, pumping station etc.

Technical data

  • Electrostatic precipitators, capicity 170 t/h - 190 t/h
  • Bottom ash, capacity 2 x 20 t/h
  • Pipings to disposal site, length 2 x 3.000 m HD-PE pipings
  • Max. power consumption 330 kW, fly ash 190 t/h
  • Suspension: 50/50 %, total 270 m3

 

Project highlight

pipings to disposal site